Skip to content

Our History

Since 1926…

Crane Service Co. has helped shape the skylines, infrastructure, and landmarks of the Mid-Atlantic region. What began along the C&O Canal in Georgetown has grown into a century-long story of resilience, innovation, and family leadership.

Through economic shifts, historic restorations, emergency response efforts, and generational transitions, the company has remained grounded in the same principles it was founded on: hard work, integrity, faith, and a commitment to doing the job right.

Each decade has added a new chapter to the story.

The timeline below reflects not only the projects completed, but the people, partnerships, and progress that have defined Crane Service Co. for 100 years.

1926
1926
Founder Robert Hutchison establishes Crane Service Company in Georgetown, Washington, D.C., along the C & O Canal, at a time when waterways were critical to commerce and westward movement.
1930s
1930s

The company’s earliest work relied on buckboard-style cranes mounted on wagons, paired with clamshell buckets. 

1940s
1940s

Crews loaded dirt and materials directly into wagons for excavation and transfer work. The process was manual, rugged, and labor-intensive, requiring skilled operators who understood terrain, balance, and timing long before modern controls existed.

1945
1945

Sherwood Hutchison, Robert Hutchison’s nephew, joins Crane Service Company after returning home from World War II, where he served with the U.S. Navy Seabees in the South Pacific. His return marks the beginning of the company’s second generation of leadership.

1955
1955

A Mack Model B truck and lowboy entered service, photographed at RFK Stadium, reflecting the company’s growing hauling and lifting capacity.

1957
1957

Supported the major reconstruction work on the U.S. Senate office building on Capitol Hill, most commonly associated with modernization of the Russell Senate Office Building. This project reflects growing trust at the highest levels of government.

1960
1960

Sherwood Hutchison steps into leadership as President of Crane Service Co.

1963 – 1971
1963 – 1971

Crane operations supported construction of the Watergate Complex along the Potomac River. Work included structural steel placement and material handling across a multi-building site during one of the largest mixed-use developments of its time.

1963
1963

Construction of President John F. Kennedy’s tomb at Arlington National Cemetery commenced. The project involved handling gray granite quarried from New England and positioning the simple flat ledger stone that marked the grave. The understated design required careful precision and reverence in one of the nation’s most sacred spaces.

1968
1968

Crane Service Co. worked at the Haupt Fountain within what is now the Smithsonian’s Haupt Garden on the National Mall. The project included precision placement of a 55-ton fountain base, requiring meticulous lift planning in a highly visible cultural setting.

1970s
1970s

The company assisted with the placement of an original USAF missile for the Smithsonian National Air and Space Museum, supporting early exhibit installations and demonstrating expertise in delicate, non-traditional lifting operations.

1984
1984

At NASA Goddard Space Flight Center in Greenbelt, Maryland, Crane Service Co. removed and replaced the main drive motor for the launch phase simulator centrifuge. The mission-critical component required extreme precision within a controlled research environment.

1984
1984

The company assisted the Bowie Lions Club with placement of a historic railroad caboose at Alan Pond Park, creating a lasting community landmark and reinforcing its commitment to local partnerships.

1993
1993

Planting of the Clinton Littleleaf Lindon tree and Willow Oak. Crane Service Co. been honored to be a part of planting over a dozen trees at the White House across multiple administrations.

1994
1994

Sherwood Hutchison and his brother Luther sold the company to Rick Mazzella and Bob Hutchison. Rick Mazzella became President, continuing operations from Kenilworth Avenue and guiding the company into its third generation of leadership with a focus on growth and operational expansion.

2001 – 2002
2001 – 2002

Following the September 11, 2001 attacks, the company was called upon to support recovery and reconstruction efforts at the Pentagon. Work was performed under intense public scrutiny and strict security protocols alongside the Pentagon reconstruction countdown clock, symbolizing resilience and progress during a pivotal moment in American history.

2003 – 2008
2003 – 2008

Major reconstruction efforts at the U.S. Capitol required the use of a Manitowoc 777T crane, one of the few cranes capable of meeting the project’s demanding height and capacity requirements. The company supported the construction of the Capitol Visitor Center, working closely with the Architect of the Capitol to meet strict historic preservation standards while helping modernize this iconic landmark.

2008
2008

Following a brake failure, a WMATA Metrobus left the roadway and crashed into a memorial and park area in Washington, D.C. Crane Service Company safely recovered and removed the vehicle, executing the lift to prevent additional damage to the surrounding site.

2010
2010

An emergency response occurred at Washington Dulles International Airport after a hangar collapsed due to extreme snow load. Crews mobilized quickly to stabilize the structure, remove damaged roof sections, and safely recover aircraft inside the hangar.

2012
2012

Crane operations supported the lifting, positioning, and planting of a new National Christmas Tree on the Ellipse near the White House. The placement of the 28-foot Colorado Blue Spruce required precise planning and coordination in a highly secure and symbolic setting. The operation was completed successfully just 48 hours before Hurricane Sandy made landfall on the East Coast.

2014
2014

The company relocated its headquarters to Capitol Heights, Maryland. The expanded facility provided greater capacity for fleet storage, logistics, and coordination, enabling more efficient mobilization throughout the Mid-Atlantic region.

2018
2018

A major transportation improvement moves forward with the widening of Route 404, expanding the corridor from two lanes to four between Route 50 and the Delaware state line. 

2021
2021

A highly visible lift took place at The Perch, the rooftop public park at Capital One Center in Tysons Corner. Crane operations placed three full-size vehicles, including a double-decker bus and two camper vans, onto the rooftop space to be converted into food trucks.

2023
2023

“Take Your Kids to Work Day” came to the Hampton office, reflecting the company’s continued focus on family and future generations.

2023
2023

Brian Mazzella assumed the role of President, representing the fourth generation of leadership and continuing the company’s legacy of family stewardship.

2024
2024

The company continues to grow and celebrate its culture and people, as reflected at the annual holiday party.

2025
2025

A complex tower crane takedown took place at the National Institutes of Health, involving erection of a luffing jib section. The high-stakes operation required advanced planning, deep technical expertise, and seamless team coordination.

2025
2025

Team members supported the Calvert Health Breast Cancer 5K, reinforcing its ongoing commitment to community involvement and service beyond the jobsite.

Have a project in mind?

Contact our team to help you plan the right solution.